Video On Demand

Chassis Kit Tutorial Video 48-Hour Access

 

Spend two hours with Tim in this comprehensive video that includes a complete overview of chassis kit construction and valuable insight into welding, fabrication, set-up and engineering. See an outline of content below.

 
 

Introduction (Start/End: 00:00 – 03:35 )

  • – General Overview
  • – Tube Notching

 

Part 1 – Jig Prep & Chassis Floor ( 03:35 – 14:40 )

  • – Surface Preparation
  • – General Instruction & Chassis Floor Set-Up
  • – Miscellaneous Fabrication Tips

 

Part 2 – Main Hoop & Cab ( 14:40 – 24:30 )

  • – Main Hoop Set-Up
  • – Dash Bar and Cab Construction
  • – Miscellaneous Fabrication Tips

 

Part 3 – Four Link & Funny Car Cage ( 24:30 – 39:25 )

  • – 4-Link Bracket Location and Set-Up
  • – Funny Car Cage Construction
  • – Weld Quality & Welding Tips

 

Part 4 – Funny Car Cage & Tail Section ( 39:25 – 1:11:00 )

  • – Complete Funny Car Cage
  • – Begin Tail Section Construction
  • – 4-link Tips and Suspension Tabs
  • – Miscellaneous Fabrication Tips
  • – Complete Chassis From Firewall Back

 

Part 5 – Struts & Engine ( 1:11:00 – 1:31:00 )

  • – Begin Construction from Firewall Forward
  • – Strut Jig, Strut Tubes, Location & Mounting
  • – Begin Engine Location
  • – General Set-Up Tips

 

Part 6 – Steering, Engine + Double Frame Rail ( 1:31:00 – 1:56:50 )

  • – Rack & Pinion
  • – Control Arms
  • – Engine Mounting, Mid Plate & Firewall Overview
  • – BONUS – Double Frame Rail Overview
  • – Miscellaneous Fabrication, Plumbing & Wiring Tips + Final Thoughts